Struma Road Changes & Repairs – NOVA.BG

by Archynetys News Desk

Traffic will pass into the lane where you don’t work

From May 19 – Monday, step -by -step repair work will be launched in sections of the Struma Highway in the territory of Kyustendil District. During the work, temporary changes will be introduced in the organization of the movement, and traffic will pass into the lane where it is not worked.

On May 19 from 9 am to 8 pm The movement in the active and emergency lane at the facility at 52 km in the direction of Sofia will be restricted in the area of ​​Dyakovo. The traffic will pass into the ahead lane and a warranty repair of a dilation joint will be carried out on the site.

On May 19 from 8 am to 7 pm The movement in the active and emergency lane in the section from 73 to 80 km in the direction of the tower, in the area of ​​Mursalevo and Boboshevo, will be restricted. Travelers will pass into the ahead lane, and the floor will be poured into the section.

Road repairs to the sea will be coordinated with hoteliers and restaurateurs

On May 20 – Tuesday, from 9 am to 8 pm The traffic to Sofia will be restricted in the active and emergency lane between 45 km and 46 km in the area of ​​Delyan. The section will be repaired by the joint and the travelers will pass into the ahead lane.

On May 20 from 8 am to 7 pm For repair of the asphalt pavement, the movement in the direction of Blagoevgrad will be restricted in the active and emergency lane from 65th to 73 km, in the area of ​​German and Boboshevo. Traffic will go into the ahead lane.

Editor: Kamena Georgieva

Source: AIP

Follow us

Related Posts

Leave a Comment