Phoenix Rail: South Central Extension Now Open

by Archynetys World Desk

“`html

Phoenix Light Rail Expands with south Central extension

A new 5.5-mile extension brings light rail service to South Phoenix, creating the region’s first two-line system and enhancing connectivity.


The Valley Metro Rail system in Phoenix has expanded with the launch of the South Central Extension/Downtown Hub.This 5.5-mile addition extends light rail service into South Phoenix, introducing the area’s first two-line configuration.

the extension links south Phoenix to downtown Phoenix and the broader Valley Metro network, establishing a system featuring both east-west and north-south lines. According to Valley Metro, the project encompasses eight new stations, a transit hub in downtown Phoenix, and a park-and-ride facility located at Baseline Road and Central Avenue.

The opening was celebrated with a public event attended by over 5,000 people,according to transit officials. Festivities took place at three locations, including the Downtown hub and Ed Pastor Transit Center, and featured live entertainment, a car show, and a community procession.

“This project marks an crucial new connection for residents and moves us closer to our goals as a sustainable and accessible city,” said Phoenix Mayor Kate Gallego during a ribbon-cutting ceremony.

The South Central extension enables the B Line to run north-south through South Phoenix into downtown, while the A Line operates east-west. Valley Metro has stated that weekday service will run every 12 minutes before 7 p.m.

With this new segment, the Valley Metro Rail system now covers 35 miles and is projected to see an increase of more than 8,000 daily boardings, adding to the current average of 32,000 daily riders.

Valley Metro CEO Jessica Mefford-Miller stated that the project was developed in collaboration with local residents, emphasizing its role in enhancing regional connectivity. “We built this project with the community to achieve their vision,” she said. “This new connection to South Phoenix is a major step in expanding mobility options.”

The $1.34 billion project was funded through a mix of local and federal sources.More than half of the funding came from federal grants, with additional support from the city’s Transportation 2050 plan and Proposition 400, a regional transportation tax renewed by voters in 2024 as Proposition 479.

The project also included infrastructure and street improvements along the corridor. valley Metro reported that over 30 miles of underground utilities were replaced, 550 desert-adapted trees were planted, and new bike lanes and sidewalks were added.

Officials reported that more than 5,000 jobs were created during construction, with over 600 workers hired directly from South Phoenix neighborhoods.

Public art installations are featured at each of the eight new stations, with contributions from 18 artists-most of them local-designed to reflect the cultural and historical character of the surrounding communities.

The city of Phoenix and Valley Metro also implemented a financial assistance program for small businesses impacted by construction. According to Valley Metro, 270 grants totaling more than $1.6 million were awarded to businesses along the route.

Local officials,including Councilmembers Anna Hernandez and Kesha Hodge Washington,noted that the project provides expanded transit access to an area that previously lacked direct rail service.

“This new extension will connect South Phoenix with the rest of the city,” Hernandez said. “It’s a long-awaited milestone for District 7.”

Councilmember Hodge Washington stated that the project adds infrastructure to an area that has historically been underserved.”South Phoenix deserves investment and inclusion,” she said.

The expansion is part of Valley Metro’s broader effort to create a 50-mile high-capacity rail system. Additional extensions are currently in planning or under construction, including in the East and West Valleys.

Light rail Development Across the U.S.

“We built this project with the community to achieve their vision. This new connection to South Phoenix is a major step in expanding mobility options.”

The South Central Extension/Downtown hub is the latest in a series of recent light rail developments in the U.S. In related news, Los Angeles recently opened its LAX/Metro Transit Center station, bringing rail service closer to Los Angeles International Airport. That station connects to shuttle service and will eventually link to the under-construction LAX Automated People Mover.

Frequently Asked Questions

How often will the light rail run on the new extension?
Weekday service on the South Central Extension will operate every 12 minutes before 7 p.m.
How was the South Central extension project funded?
The project was funded through a combination of local and federal sources, including federal grants, the city’s Transportation 2050 plan, and Proposition 479.
What improvements were made along the light rail corridor?
Improvements included the replacement of over 30 miles of underground utilities, the planting of 550 desert-adapted trees, and the addition of new bike lanes and sidewalks.
How many new stations are included in the South Central Extension?
The extension includes eight new stations, each featuring public art installations.
What is the overall goal of valley Metro’s expansion plans?
the expansion is part of Valley Metro’s broader effort to create a 50-mile high-capacity rail system.

Anya Schmidt

Anya Schmidt is a reporter covering urban development and transportation. She has a passion for sustainable cities and efficient transit solutions.

Related Posts

Leave a Comment