
The Mülheim local politicians should get a picture of this planned construction work on site (the building permit was granted in October 2022 – a building sign is not available).
These conditions are intolerable. Many residents have already moved away.
Essence committed can be heard from politics.
But the WohnCarree Möllhof GmbH sits.
I’m curious to see which party takes up before the local elections.

Embed video
Only individual videos of the respective platforms can be integrated, but not playlists, streams or overview pages.
Embed code
Functionality of the embedded code without guarantee. Please embeds for video, social, link and maps with the codes provided for by the system.
Would you like to contribute yourself?
Now register for free to contribute with your own content.
