French Building Federation: Navigating Industry Challenges

by Archynetys News Desk

Last year, 360 companies and 1,300 jobs disappeared in the building sector in Hérault. The current sites come from consultations launched three years ago and the effects of the new measures will not be felt until 2026, notes Gilbert Comos, president of the FFB 34. And to warn: “If nothing changes, only two or three companies will participate in tenders, weakening the entire sector. To brake this drift, the FFB34 is betting on the Ethibat-cheerful charter which promotes business ethics and announces the establishment of a local steering committee. By associating promoters, developers and donors, its members will work on tracks to adjust costs. “The payroll, which represents 40 % of the final price, has jumped 19 % since 2019,” he recalls. The result is expensive projects, particularly in Montpellier where the architectural requirement is strong. »»

Hors-site carefully

At the heart of solutions: a change of method. “The projects are so in advance that time is lacking to refine the design,” deplores the president of the FFB 34. The stake is therefore clear: “do well at first” and reduce deadlines, estimated at five years, between the idea and delivery. “The out-site is relevant in a dense urban environment, but beware of the return of the standardized constructions of the years 1960-1970”, warns the representative of the professional organization who also pleads for “an adaptation of standards taking into account the local climate. Testing a metropolitan model favoring summer comfort would control costs. The village of athletes in Paris has shown it: the regulations can be softened, when you have the will. »»

Related Posts

Leave a Comment